1 Testing 11.5/1.206/1.218 kV Rectifier Transformer 1 ALBA ABB AG 12/2016
2 180MVA Transformer HV        cable box oil filtration 2 SULB PGP        Contracting 04/2017
3 Testing 220/33 kV 180MVA ABB transformer 2 SULB PGP        Contracting 04/2017
4 220 KV 127.4 MV transformer oil Drainage /Refilling /filtration 2 ALBA THT 06/2017
5 220kV Transformer Buchholz relay replacement 3 EWA Alstom 08/2017
6 Testing of 33/8.3 kV 66MVA transformer 1 SULB PGP Contracting 11/2017
7 Testing of Tamini 33/10.5 KV transformer 1 SULB PGP Contracting 11/2017
8 Erection & Testing 66/11 kV    20 MVA Transformer at Banagas S/S 3 EWA Hyundai 12/2017
9 Oil filtration & transformer Testing of 66 kV 40 MVA transformer at Durt Al Bahrain S/S 1 EWA GE 12/2017
10 Erection of 220 kV 120 MVA transformers 3 ALBA Siemens 02/2018
11 Erection of 220 kV 60 MVA transformers 4 ALBA Siemens 04/2018
12 66 KV 20 MVA Transformer Erection and Testing (Safra S/S) 3 EWA Hyundai 04/2018
13 21 KV 30 MVAR Reactors Erection and Testing (Safra S/S) 2 EWA Hyundai 05/2018
14 Oil Filling and oil circulation of 27MVA, 2.5MVA,2MVA and 1.6MVA Transformers 7 LNG Mcsc 05/2018
15 220KV Safra Substation Tx erection and testing 150 MVA 3 EWA Hyundai 07/2018
16 Erection of 220 kV 315 MVA transformers 3 ALBA Siemens 07/2018
17 Erection of 220 kV 450 MVAR Reactors 4 ALBA Siemens 10/2018
18 Replacement of rectifier Transformer units 47.5MVA 4 ALBA PGP Contracting 11/2018
19 Oil Filtration for 2000KVA Transformers (400kV Substations) 6 Siemens PGP Contracting 11/2018
20 Replacement of 88MVA Generators Transformers 6 EWA Hyundai 05/2019
21 220kV 150MVA TX cable box link connection and oil filtration 3 EWA Siemens 05/2019
22 Rectiformer Diode cubical overhauling 4 ALBA PGP Contracting 07/2019
23 66 KV 20 MVA Transformer Erection and Testing (E Sitra S/S) 3 EWA Hyundai 09/2019
24 21 KV 30 MVAR Reactors Erection and Testing (E Sitra S/S) 2 EWA Hyundai 09/2019
25 66 KV 60 MVA Transformer Erection and Testing (Sitra Tank S/S) 3 EWA Hyundai 02/2020
26 220KV E Sitra Substation Tx erection and testing 150 MVA 3 EWA Hyundai 12/2019
27 Recti former Diode cubical overhauling 2 ALBA PGP Contracting 12/2019
28 220kV 130MVA Transformer Erection and Testing (BMP S/S) 4 EWA Hyundai 02/2020
29 400kV Riffa Substation 400MVA Transformer erection and testing 1 EWA Hyundai 07/2020
30 400kV 150MVar Reactors      erection and Testing (Ras Legrain S/S) 6 EWA Hyundai 09/2020
31 132kV Harmonic Filters overhauling 291 ALBA PGP Contracting 10/2020
32 21 KV 30 MVAR Reactors Erection and Testing (Amazon Asker S/S) 2 EWA Hyundai 11/2020
33 6.6kV 2.5MVA Transformer Testing 1 SULB PGP Contracting 2/2021
34 220kV 150MVA Transformers Erection and Testing (Amazon Asker S/S) 3 EWA Hyundai 3/2021
35 220kV 487MVA TX cable box link connection, oil filtration and Transformer Testing 3 ALBA PGP Contracting 2/2021
36 220kV 196MVA TX cable box link connection, oil filtration and Transformer Testing 3 ALBA PGP Contracting 2/2021
37 66kV 20MVA Tx replacement 1 EWA PGP Contracting 8/2021
38 21kV 30 MVAR Reactors oil leak repair (Hamala S/S) 2 EWA Hyundai 11/2021
39 21 KV 30 MVAR Reactors Erection and Testing (Ramli S/S) 2 EWA PLC Ongoing
40 220kV 150MVA Transformers Erection & Testing (Ramli S/S) 3 EWA PLC Ongoing
41 220kV 487MVA TX Transformer Testing 2 Alba PGP Contracting 2/2022
42 220kV 196MVA TX Transformer Testing 2 Alba PGP Contracting 2/2022
43 21 KV 30 MVAR Reactors Erection and Testing (E Hidd S/S) 2 EWA PLC Ongoing
44 220kV 150MVA Transformers Erection & Testing (E Hidd S/S) 3 EWA PLC Ongoing
45 220kV 150MVA Transformer oil filtration work (Safra S/S) 2 EWA Hyundai 3/2022
46 21kV 30MVAR Reactors oil filtration work (Safra S/S) 2 EWA Hyundai 3/2022
47 66kV 20MVA Transfirmer replacement at Bar Saar S/S 1 EWA Hyundai 4/2022